I apologize now for the boatload of photos in this post. I got a little camera-happy today :)
While Baby H prevented me from helping much with the manual labor, the boys were hard at work! We started bright and early with the digging:
| Nice tire tracks in the yard |
Thankfully the guy we had dig out the area was willing to spread the gravel in the space as well.
The next step was to tamp down the gravel.
| Todd manning the tamper |
After some debate over the process (the laptop had to be brought out at one point to get everyone "back on the same page" ;) ), the sand eventually was spread on top of the gravel using pvc pipes as a guide.
| Sandy sat at the back door ALL day. |
Finally, they started laying the pavers in the modified herringbone/K/I pattern.
| Started in one corner and worked out |
| We borrowed the neighbor's wheelbarrow, luckily it survived the process. |
The final pavers were cut and laid as the sun went down.
And here's the current state of affairs:
| left/octagon |
| right |
Tomorrow we have to tamper it and put the sand over the top. I think we are also going to use some of the extra pavers to build a step down out of the back door. It's sure to be another exciting day in our backyard!
looks great! what a big weekend project!
ReplyDelete